Regulations and compliance · Practical guide

GxP subcontractors: who oversees the next level of the supplier chain?

A list of company names reveals little about GxP subcontractors. Identify the delegated work, the data each party can affect and the information your company receives. A hosting provider, operator and support service may have different responsibilities beyond your immediate contractor in a human medicines GMP process.

Table of contents

At a glance

Which subcontractors do we need to assess for our GMP process?

The contract giver retains control. EU GMP Chapter 7 section 7.4 requires processes to control outsourced activities. Under 7.11 the contract acceptor may subcontract assigned work only after your prior assessment and approval and must make information from the next provider’s suitability assessment available. Audit rights should cover mutually agreed subcontractors under 7.17. Map the actual services, responsibilities and evidence. Naming the main supplier alone does not identify who holds data or operates critical services.

  • The activity determines the significance of a contracting party, not merely its company name.
  • Distinguish subcontracting under Chapter 7 from general technical supply.
  • Changes must ensure that responsible personnel receive timely and actionable information.

1. Identify the outsourced activity first

The specific example scope is human medicinal product GMP. Chapter 7 addresses outsourced activities falling within the GMP guidelines. Annex 11 additionally covers agreements with third parties who provide IT services such as installation, configuration, maintenance, data processing, or storage.

Start with a description of the actual work performed. Procuring a server is not equivalent to operating your quality-related applications, including data backup. Generic supplier categories provide limited value when they obscure the essential responsibilities and access points.

Sources: [1] [2]

2. Document the performance chain by task assignment

A simple chain can already involve multiple points of responsibility. The direct contracting partner must know which activities are performed by other parties and which information flows back from them. Your organization requires the information relevant to its evaluation and control, without needing to manage every technical detail unverified in-house.

The own matrix describes an example of an operating model. It does not represent an actual architecture of a particular provider and does not imply a contractually guaranteed scope of services.

Example: own performance chain of a GMP document management system
LocationAccepted taskRequired control informationOpen accountability question
Pharmaceutical company Intended use and quality decisions Own Scope and Required Records Who evaluates changes to the process?
Application operator Operation, Configuration, and Support Changes, disturbances, and affected functions Who coordinates the downstream sites?
Hosting service Technical Infrastructure Relevant operational and site changes What impact does the operator report further?
Backup service Agreed Security and Recovery Scope, Reproducibility and Failures Who verifies the restore of the required data version?

Sources: [1] [2] [3]

3. Do not discover further assignments afterwards

Chapter 7.11 requires the contractor to obtain prior evaluation and approval of the transfer of responsibilities by the customer. This provision must not be weakened to an unbinding subsequent communication. At the same time, it must first be clarified which activities actually fall within the defined scope.

For IT services, agreements should clearly define the relevant scope and responsibilities. A general website with rotating vendors may provide information but does not automatically address questions regarding evaluation, approval, and impact on your process. Effective contractual and organizational implementation is essential.

Sources: [1] [2]

4. Example: New security service, identical product interface

In the operating model described in Section 2, the application interface remains unchanged, while the operator wishes to implement a different backup service. Three key questions are addressed: Is the agreed data volume scope preserved? Does restoration functionality operate effectively? Are authority and information flow responsibilities appropriately defined?

In the current status of the example, data scope and responsibility are established; the restoration of the required data state remains open. Two clarified questions render the third no less significant. This case is not a recommendation to unconditionally accept a change despite an open critical justification. The responsible decision must take into account the actual significance of this gap.

Own completed assessment of the approved service provider change
Area to assessState of work in the exampleEvidence neededSequence of decisions
Data scope Resolved Required records and configuration includes Assign existing evidence
Restore Open Appropriate restoration including professional availability Assess the gap prior to user decision.
Responsibility Resolved Operator coordinates service and fault reporting Assess practical feasibility
Distribution Scope-related decision to be made Required prior assessment and approval Not only retrospective acknowledgment
Total 2 of 3 key technical questions resolved Open restore remains visible No release rate derived from the number

Sources: [1] [2]

5. Verify supplier certifications as stated by them

An audit report, a certificate, a technical description, and a test protocol address different questions. Assess which aspect—functionality, performance, environment, and time—each document pertains to. A suitable report can provide valuable evidence without automatically covering the entire customer-specific process.

The scope of evaluation shall be determined based on the significance of the activity. This does not necessitate a one-size-fits-all on-site full audit of every technical supplier. However, Chapter 7 requires appropriate controls and agreed-upon audit opportunities for outsourced activities; Annex 11 recommends a risk-based approach for the assessment of suppliers and service providers.

Sources: [1] [2] [4]

6. Close the information pathway to the correct individual

Define who receives, professionally evaluates, and escalates changes and deviations. Sending a notification to a rarely used procurement mailbox does not constitute effective quality assessment. The content must clearly indicate what has changed and which data, functions, or operational records are affected.

Appropriate references to service, activity, and relevant environment are meaningful. Additionally, specify how missing information will be requested and how open items will be tracked. A general response timeframe is not a universal GMP value; the agreed process must align with the criticality and specific requirements of the activity.

Sources: [1] [2]

7. Maintain the chain during operation and at contract end date

The original assessment remains useful only when relevant changes are considered. This may include new subcontractors, altered roles, or a different location of data storage. Not every organizational change necessitates the same level of review; what is decisive is the actual impact of the change.

At the end of a service delivery, it must be clearly defined which records and information remain available and who supports the handover. Chapter 7 emphasizes access to relevant documentation. A terminated master agreement must not inadvertently render the required evidence inaccessible at a subsequent location.

Sources: [1] [2] [3]

8. Checklist for the next level of the supply chain

Use the checklist for a specific service rather than for an abstract vendor group. This enables identification of critical gaps in responsibility or information flow. The number of listed companies is not an indicator of the control's quality.

The following internal guidance document does not replace a review of your actual contracts. It assists in translating technical requirements into appropriate agreements and recurring operational decisions.

  • Transferred responsibilities and GMP/IT scope defined.
  • Positions with specific responsibilities following the relevant stage have been identified.
  • Previous evaluation and approval, upon relevant onward transfer, are governed.
  • Supplier performance and environmental conditions evidence.
  • Information on changes and deviations is agreed to be professionally actionable.
  • Responsibilities for data, recovery, and access have been clarified.
  • Transfer and availability of required records at the end of the contract is considered.

Sources: [1] [2]

Project experience and collaboration

Trace the service delivery chain through to the critical data flow

Who operates the service, who has maintenance access and who holds the backup? With supplier managers, we trace these questions from the main contract to the party actually responsible. An unambiguous chain may be supported by clearer agreements and existing evidence. Undisclosed handovers or missing information require deeper assessment. We help bring together services, communication paths and open evidence. Your designated owners retain responsibility for assessment and approval.

Frequently asked questions about GxP subcontractors

Is every cloud service provider automatically a GMP subcontractor?

The term "cloud" alone does not determine the outcome. Define the transferred activity and the role of the entity involved. Chapters 7 and Annex 11 may contain relevant requirements, but a third-party component supplier is not inherently equivalent to a service provider that processes your GMP data.

Sources: [1] [2]

Is a publicly available subcontractor list available?

It can serve as a useful starting point. Additionally, tasks, relevance, and appropriate agreements must be clearly demonstrable. A list of names does not clarify the data scope, information flow, or any potentially required prior authorization for onward dissemination.

Sources: [1] [2]

Can the operator transfer external GMP tasks arbitrarily?

Chapter 7.11 requires prior evaluation and approval of the agreements by the customer. First, assess the specific scope. A general reference to economic flexibility does not substitute for this technical and contractual review.

Sources: [1]

Do we need to perform on-site audits of every subcontractor?

Extent and appropriate evidence are based on activity and risk. Agreed audit options and a reliable assessment remain important. A risk-related approach is neither an automatic full audit obligation nor a justification to leave relevant information unaudited.

Sources: [1] [2] [4]

Can the direct contracting party consolidate all information for us?

Yes, a clear and coordinated information flow can be beneficial. It must actually provide the content required for your decisions. Responsibilities and access to relevant evidence must not be compromised simply because the next level formally stands outside your direct contract.

Sources: [1]

Who remains responsible for our intended GMP use?

The contracting organisation remains responsible for appropriate control of outsourced activities throughout the chain. The contractor performs its agreed duties. Define responsibilities and evidence so that your own process can be assessed.

Sources: [1] [2]

Is a security certificate considered worthless as evidence?

No. It may be relevant for the actual services and controls covered herein. Check scope, time period, and limitations. However, it does not automatically address any questions regarding customer-specific data processing, recovery, or use in the process of the application.

Sources: [2] [4]

Must every change to the supply chain be fully reassessed?

Not every change carries the same significance. Assess which tasks, data, or controls are affected, and which existing records remain valid. However, a change should not be deemed trivial solely because the user interface remains unchanged.

Sources: [1] [2]

What do we do when the supplier does not provide sufficient information?

State the specific open question and its significance for your process. Request appropriate information and make clear, justifiable decisions regarding further actions. Lack of information is not evidence of low impact or established control responsibility.

Sources: [1] [2]

Which question should SMEs clarify first?

Who actually performs the critical functions and who provides the associated evidence. A concise, clear task plan can be more effective than a lengthy, general supplier list. Thereafter, key agreements and outstanding audit tasks can be systematically identified and prioritized.

Sources: [1] [2]

Sources and review date

Source date: 7 October 2026. Outsourced activities within the specific human medicinal product GMP process; other GxP and data protection regulations apply separately. Tables and case studies are standalone reference tools, not completed product testing. Draft versions do not establish enforceable additional obligations.

  1. EU-GMP Chapter 7: Outsourced ActivitiesRevision 1; applicable from 31 January 2013; 7.1–7.8 Assignor and Control; 7.11–7.12 Subcontracting/Amendments; 7.14–7.17 Contract, Records, and Audit Opportunities
  2. European Commission: EU GMP Annex 11, Computerised SystemsRevision January 2011; from 30.06.2011; Sections 3.1–3.4: Suppliers and service providers and agreements; Sections 7.1–7.2: Data and recovery records; 10 amendments
  3. PIC/S: PI 041-1, Data Management and IntegrityPI 041-1, 01.07.2021; 9.1.10 outsourced systems and 10.1–10.3 data integrity in the supply chain
  4. EMA/ICH: Q9(R1), Quality Risk ManagementEMA/CHMP/ICH/24235/2006 Corr.2; Publication date 31.01.2025; Q9(R1) effective from 26.07.2023; 3 Principles; Sections 4.3–4.6 Risk assessment/Control/Review; Section 5.1 appropriate formality

Sources checked: .

Daniel Herrmann, Daniel Herrmann Consulting

Daniel Herrmann Consulting

Clarify responsibilities beyond the contract boundary

We support you in the professional assessment of your performance chain, appropriate supplier verification evidence, and feasible information and change management pathways.

  • Cloud and SaaS validation →

    Maintain the validated state of cloud and SaaS systems as suppliers issue new versions. We define the boundary between your responsibilities and the supplier’s and agree how each release will be assessed.

Send a project enquiry Customer testimonials →